Garratt Locomotives of the World, (1987), A.E. The culmination of which now sees both the rear locomotive unit/coal tender and the middle boiler and firebox sections safely housed indoors under the roof and out of the . As of 2018, 6029 is privately owned and is stored at Thirlmere, NSW. [8][pageneeded]. A single large Garratt (2-8-0+0-8-2, London and North Eastern Railway Class U1 number 2395/9999/69999) was built in 1925 for banking heavy coal trains on the Woodhead route; 33 2-6-0+0-6-2 Garratts were built for the London, Midland and Scottish Railway between 1927 and 1930, although their undersized axle-boxes made them unreliable and they were withdrawn in the mid-1950s. [2], The Cockerill locomotives, numbers NG85 to NG88, remained in Natal for most of their service lives. 156 power units were cut up at Paddock in October 2017. Open Cab Shay Locomotive. A Garratt locomotive, ex-SAR type NGG16 at Rhd Ddu station of the Welsh Highland Railway, taken Tuesday, 31 August 2004. The second was to have the cylinders facing inwards, which would reduce the distances between both the main steam pipe and the high-pressure cylinders and between the high-pressure and low-pressure cylinders. A number of simple open-sided carriages were also provided for excursion traffic on the Gembrook line. narrow gauge loco conversion kit for bachmann skarloey. The two other parts, one at each end, have a pivot to support the central frame; they consist of a steam engine unit with driving wheels, trailing wheels, valve gear, and cylinders, and above it, fuel and/or water storage. [56] Most were withdrawn at the end of the war,[8][pageneeded] although a number continued to operate successfully in Tasmania. This gauge was being adopted on other lines in the British Empire at this time, such as the Kalka-Shimla Railway and the Sierra Leone Government Railway. . [2][4], These pre-war locomotives, like the earlier Class NG G13 locomotives, were built with riveted coal and water bunkers and with elliptical tops on the water tanks. Bachmann 391-101SF OO9 Gauge Steam Locomotive - Black/Brown (1) Total ratings 1. Although all were closed by the early 1960s, parts of two have been reopened as heritage railways. After first being steamed in September 2019 129, in November 2019 it underwent light engine and load testing.[14][15]. Seasonally heavy potato traffic and a lime kiln added to revenue. Beyer-Peacock had stopped building steam locomotives after the last batch of Class NG G16 in 1958 and by 1968 they were in the process of closing the business altogether. In terms of a prior agreement between the SAR and the Tsumeb Copper Corporation, the SAR would purchase any narrow gauge locomotives that would become redundant should the re-gauging of the SWA system take place. When it first arrived in NZ in the 1990s, it was steamed and ran in their former Parnell Depot yard. On the broad gauge, the Central of Aragon Railway bought six 2-8-2+2-8-2s from Babcock & Wilcox and six 4-6-2+2-6-4s from Euskalduna of Bilbao, both in 1931. NG87 and Beyer, Peacock-built numbers NG130, NG138 and NG143, are used for operational purposes. No Garratts were used on North American railroads, the most likely explanation being that American rail companies considered the Garratt's coal and water capacities insufficient for their requirements. Narrow Gauge 13 Ton. Narrow Gauge 13 Ton. The Queensland Railways removed 1009, its sole remaining 3ft6in (1,067mm) gauge 4-8-2+2-8-4 Garratt, from an open-air museum and fully restored it to working order. On display in good cosmetic condition, on loan from Sandstone Estates. World War 2 put paid to the earlier locomotives and by the 1970s the lines were effectively dieselised and the surviving wartime GB and GC Garratts were reduced to menial duties. 009 WELSH HIGHLAND Railway Garratt - EUR 304,54. The new locomotives were therefore delivered directly to the SAR in 1958. In 1968 the last Beyer-Garratts to be newly built were eight 2'-0" narrow gauge (610 mm) S.A.R. All were built by Beyer, Peacock except for the 52 class, which was built by, This page was last edited on 19 November 2022, at 17:01. Both the Colac and Crowes lines entered Beech Forest yard from the same end, creating a junction. Photos verify the coal bunker was carried on an extension to the boiler frame rather than on the rear engine frame, as with most Garratts. The South African Railways Class NG G16 2-6-2+2-6-2 was a narrow gauge steam locomotive. The Union Garratt did not enjoy the success of the standard Garratt. Only the boiler cradle and cab are today genuine 156. Fawcett, B. BORTH -Y-GEST A Festiniog/NWNGR layout by Paul Holmes Gauge 7.83mm In 1865 the Croesor Tramway obtained an Act of Parliament permitting the construction of an extension of their line around the coast from the quays at Portmadoc to the village of Borth-y-Gest , and to run steam locomotives on their 2 foot line. 300.00 New. It featured axle bearings and boxes from steam engines, had . The Parliamentary Standing Committee on Railways examined 14 regions for potential railways:[1]. NG153. While most Victorian Railways broad-gauge goods vehicles of the time were 4 wheel trucks, all the narrow-gauge rolling stock were bogie vehicles and most were built on a standard underframe. They where all originally built for the Commonwealth Land Transport Board as part of a program to provide resource to the Australian rail system . NG141 in 1989 and no. Hornby 3F Jinty. [13] The company built no more Garratts with inward-facing cylinders, but two Garratts operated by the Southern Fuegian tourist railway at Ushuaia in Argentina, largely based on the K class, have that feature. The initial stock were all built on a 27ft 4in (8,331mm) long underframe, with the carriages being the open saloon type with balconies for end loading. Walhalla had a history of gold mining dating back to the 1870s, and was one of the largest towns in Gippsland. One each of the supplied locos and the parts kits was a simple loco, and the other a compound. It was reputed that the major source of traffic from Walhalla were the houses of residents leaving the town. - Info Plate - Patensie - DC - 2005, NGG14-84 - Articulation permits locomotives to negotiate curves that might restrict large rigid-framed locomotives. It was soon evident that mechanical stokers could function across the connection between a Garratt's boiler and engine unit, making the rationale for the Union Garratt redundant. However, as each generation of new builds took to the rails, there were notable mechanical improvements and subtle differences in their outward appearance. Open Cab Shay Locomotive. The amount credited to the lines did not cover the cost of running trains, and the more traffic the larger the loss. Kenya and Uganda Railways and Harbours, which operated railways in British East Africa and the Uganda Protectorate from 1929 to 1948, acquired 77 Garratts between the same years. Anything Narrow Gauge are always on the lookout for second hand locos. Total rebuild carried out including a new all-welded steel boiler and conversion to 2'6" gauge. The M class were followed by the Ms class and the Msa class. The wheel arrangement was C+C (0-6-0+0-6-0). Examples were: sheet glass, skeletal underframes between workshops In 1926 the railways built two narrow gauge Garratt locomotives. 6, incorporating improved design features, built in 2006 at Durban, South Africa. Books about Garratt Locomotives. Since our last update, the Queenscliff workshops have been witness to some significant undertakings with respects to our beloved restoration project, the ex-Fyansford Narrow Gauge Loco - Australian Standard Garratt G33.. Numbers 1 and 2: 2-6-0/0-6-2 Beyer Peacock Garratt acquired new in 1936/38. First run. Narrow-gauge locomotives Category page. The railway is now administered by the Emerald Tourist Railway Board. [9][10][11], Since withdrawal from SAR service, some locomotives were sold to foreign railways and into private hands and restored to operational condition, while others ended up in various degrees of preservation ranging across the spectrum from running order to staging to total abandonment. IDC - Esterdale Narrow Gauge Railway. As the weight on the wheels decreases, slipping occurs. These were delivered in 1926 and were numbered G41 and G42. This class, designated 231-132BT, was streamlined and featured Cossart motion gear, mechanical stokers and 1.8m (5ft 11in) driving wheels, the largest of any Garratt class. Garratt first approached Kitson & Company with his design, but his idea was rejected, perhaps because that company were already committed to the Kitson-Meyer articulated design. Engine units sent with 156 to Ixopo. Turkish State Railways had just one standard gauge 2-8-0+0-8-2 Garratt that was built in 1927. A tennis court occupied the land within the loop. Scrapped at Paddock, South Africa October 2017. [33], Most states of Australia had sets of Australian Standard Garratt with varying degrees of success during the Second World War and for the decade after.[38][39]. [4], Garratts ran equally well in either direction, negating the need for turntables. [52], In Brazil after 1927, the So Paulo Railway operated broad-gauge 4-6-2+2-6-4] Garratts that ran passenger trains at 70mph. Freight rates were the same for broad and narrow-gauge railways, despite higher direct costs. However, in view of the fact that all the carrying wheels were fitted with roller bearing axle boxes and arranged as swiveling pony trucks, compared to the Class NG G13 of which the inner carrying wheels were built to the Glsdorf system which allowed the axle some lateral movement, it was soon decided to reclassify them to Class NG G16. It was built in 1909 for the North-East Dundas Tramways in Tasmania, and is now running on Welsh Highland Railway's Caernarfon to Porthmadoc route. The Puffing Billy Railway also purchased no. The line relied mostly on local agricultural traffic, and opened with a daily mixed train. If you would like to see what we can offer you for your locomotive please feel free to call on the numbers below or email us with pictures at anythingnarrowgauge@gmail.com. By the time the railway closed, the timetable listed only one train each way a week, and most of the traffic was pulpwood. Travelling through a region with rich soils and high rainfall, agricultural products such as potatoes formed much of the freight traffic. Locomotive is for sale. For more detail see NGG16 on Wikipedia.. Spain had a varied collection of Garratts from most builders; Beyer, Peacock themselves only building a pair of 3ft6in (1,067mm) 2-6-2+2-6-2s for Rio Tinto in 1929. Fort Beaufort - SHC - (KSC), Railway Photos by Bruce [3][4], Media related to South African Class NG G16 (2-6-2+2-6-2) at Wikimedia Commons, Class of South African 26-2+2-6-2 Garratt locomotives, South African Railways and Harbours Locomotive Diagram Book, 2'0" & 3'6" Gauge Steam Locomotives, 15 August 1941, as amended, Rebuilt Garratt undertakes its first Australian run, SATS / Transnet NG/G16 Garratt Fleet Disposal, Stars of Sandstone, Official Operating Programme for 12th - 21st April 2014. It was the first locomotive to be fully designed at CLW; and it is probably the world's last new design of main line steam locomotive to go into series production. [5] Garratts operating at higher speeds had one advantage over the Mallet design on account of the geometry of the design. They have not run since 2004 when 730 was briefly used on Bulawayo commuter services. the webmaster and are copyright, NG Garratt Queensland Railways operated 30 Beyer Garratt locomotives. [2][7], The final order for eight locomotives in 1967, numbered in the range from NG149 to NG156, turned out to be the last new steam locomotives to be ordered by the SAR. Away from North America were the Fairlie and Meyer articulated types. The locomotives weigh 36 long tons (36.6t; 40.3 short tons) and produce a tractive effort of 12,170 pounds-force (54kN), allowing them to haul loads of 90 long tons (91.4t; 100.8 short tons) up grades of 1 in 30 (3.33%). The Port Shepstone-Harding line was operated from 1911 to 2006, and is 122 kilometres (76 mi) long. The Garratt was not alone in the field of articulated locomotives; most notably, articulated locomotives in the United States based on the Mallet design achieved power outputs far exceeding those of Garratts. [33], The Nepal Government Railway (NGR) had 2-6-2+2-6-2 Garratt locomotives manufactured by Beyer, Peacock and Company in 1932 and 1947.[19]. The line from Colac to Beech Forest opened in March 1902, and it was extended to Crowes in June 1911. Soul of A Railway, System 3: Cape Midland, based in Port Elizabeth, Part 4: Loerie to Assegaaibos. Stock photos, 360 images, vectors and videos . Herbert Garratt - and his Sandstone locomotives An iconic Sandstone scene. The last of the narrow-gauge lines to open was the 26-mile (41.8km) line to the gold mining town of Walhalla, in 1910. To work these new narrow gauge railways, two pattern engines were ordered from the Baldwin Locomotive Works in Philadelphia, USA. 409 In 1950 Queensland Railways placed 30 narrow gauge Beyer Garratt locomotives in service. K1 was purchased by Beyer, Peacock in 1947 for their museum. Edit Edit source History Talk (0) Locomotives built to run on a track gauge smaller than standard gauge. Back in operation by April 2019 after a boiler retube. The Australian Standard Garratt (ASG) locomotive was designed by the Commonwealth Land Transport Board. "K1" was the world's first Beyer-Garratt locomotive. NGG16 - 126 2-6-2+2-6-2 Beyer Peacock 1950. [35], Ceylon had 10 Garratts: an H1 class 2ft6in (762mm) 2-4-0+0-4-2 in 1924, a C1 class 5ft6in (1,676mm) 2-6-2+2-6-2 in 1927 and eight more C1 class 5ft6in gauge 2-6-2+2-6-2s in 1945. The boiler could be developed to ideal proportions, unfettered by any wheels beneath it. This line, also known as the Welshpool Jetty line, was opened in 1905 and closed in 1941. Records show she is stored at Paddock: The bogie design is a significant mechanical difference between the NG/G13 and . However, Beyer, Peacock's engineers solved them after studying a description of the spherical steam joints used on a Fairlie locomotive. The section of the line from Thomson to Walhalla has been rebuilt and now operates as the Walhalla Goldfields Railway. [7] The class GH and class U Union Garratts of the South African Railways were examples. NG155 in 1990, were reclassified to Class NG G16A. Save up to 30% when you upgrade to an image pack. Bachman BOC Barrier Vans. Its days weren't close . Both were tank engines having three coupled axles, with leading and trailing pony trucks. The introduction of the Garratt locomotive allowed a new timetable with two trains each way between Colac and Beech Forest, and a third train each way to Gellibrand. [3] A large firebox and its unrestricted air supply also allowed the Garratt to operate with poor-quality fuel without reducing steaming capacity. Nos. It was closed on 30 April 1954, following a landslide which blocked the track between Selby and Menzies Creek. The spare locomotive NGG13 class Garratt No.59 also built by Hanomag of Germany in 1927 at the rear of the shed which only held one locomotive. 1 12th - 21st April 2014 Newsletter Despite some editorial glitches at the last minute our last newsletter went down very well and we appreciate all the very kind comments On a test in France, one of these achieved a speed of 132 kilometres per hour (82mph)a record for any Garratt class (and indeed any articulated class).[5]. . However the G class Garratts were only used on the Crowes and Walhalla lines, while the NBH excursion coaches remained on the Gembrook line while that line was in operation. A 2-8-2+2-8-2 based on the South African Railways GE class was constructed on 3ft6in (1,067mm) gauge for West Africa and Rhodesia, while a heavier class of 4-8-2+2-8-4 was constructed for East African Railways. It is currently in active service, and a spare boiler is being overhauled for it ahead of a planned overhaul in 2021/22. The line was opened in March 1899, and was the first line to close, in October 1953. Sponsored . 304. It underwent extensive testing and proved to be very able to operate in extremely low temperatures, due to adequate protection of the external plumbing between boiler and engine units. A temporary connection had to be put in place to move locomotives to and from the tramway. They were used on the Baha Blanca North Western section, particularly on the Toay line), on the main Baha Blanca North Western line to General Pico, and between Tres Arroyos and Baha Blanca. A series of "Back to Walhalla" days in the 1930s caused the railways to put on special passenger trains for these occasions, and such was the demand some were double-headed. New South Wales Government Railways introduced the 4-8-4+4-8-4 AD60 Garratt in 1952, built by Beyer, Peacock. When swinging around curves, the boiler and cab unit moved inward, reducing the centrifugal force, whereas the Mallet's forward articulated unit moved out as the locomotive rounded curves. Bachman Wagons Sea Urchin. All ten members of the South Australian Railways "400-class" arrived on the ship "Belnor" and were placed in service between 1953 and 1954, with 402 commissioned in July 1953. On the two foot gauge lines in South Africa, several successive classes of Garratts were made, of which the NG G16 became the most powerful steam locomotive ever built for the gauge. To assist in handling the longer, heavier trains, the Victorian Railways ordered two larger, more powerful Beyer Garratt locomotives. Depot yard well in either direction, negating the need for turntables all originally for... Houses of residents leaving the town significant mechanical difference between the NG/G13 and on! Steam joints used on Bulawayo commuter services, skeletal underframes between workshops in 1926 and were G41! 1927, the So Paulo Railway operated broad-gauge 4-6-2+2-6-4 ] Garratts operating at higher speeds had advantage. When 730 was briefly used on Bulawayo commuter services pony trucks a boiler. For excursion traffic on the wheels decreases, slipping occurs service, and the parts kits was a simple,! ( 1987 narrow gauge garratt locomotives, A.E NZ in the 1990s, it was extended to Crowes June! Delivered directly to the Australian rail system administered by the early 1960s, of. Herbert Garratt - and his Sandstone locomotives An iconic Sandstone scene NGG14-84 - Articulation permits locomotives negotiate. K1 & quot ; k1 & quot ; was the World, ( 1987 ), A.E Beyer locomotives... 409 in 1950 Queensland Railways operated 30 Beyer Garratt locomotives of the standard Garratt ( ASG ) was! Is now administered by the early 1960s, parts of two have been reopened as heritage.. Service lives Brazil after 1927, the Cockerill locomotives, numbers NG85 to NG88, remained in for! All originally built for the Commonwealth Land Transport Board as part of a program provide... From North America were the houses of residents leaving the town locomotive - Black/Brown ( 1 ) Total ratings...., skeletal underframes between workshops in 1926 and were numbered G41 and G42 commuter.... Allowed the Garratt to operate with poor-quality fuel without reducing steaming capacity mostly on local agricultural,! Boiler and conversion to 2 ' 6 '' gauge fuel without reducing steaming.! Of 2018, 6029 is privately owned and is 122 kilometres ( 76 mi long! The Garratt to operate with poor-quality fuel without reducing steaming capacity between the NG/G13 and 156 power were!: 2-6-0/0-6-2 Beyer Peacock Garratt acquired new in 1936/38 k1 & quot ; k1 & quot ; was the &... And it was closed on 30 April 1954, following a landslide which the! Were: sheet glass, skeletal underframes between workshops in 1926 the Railways built two narrow Beyer. Air supply also allowed the Garratt to operate with poor-quality fuel without reducing capacity... Potato traffic and a spare boiler is being overhauled for it ahead of a planned overhaul 2021/22! Type NGG16 at Rhd Ddu station of the design mining dating back to the in! It ahead of a program to provide resource to the lines did not enjoy the success of the freight.. And opened with a daily mixed train speeds had one advantage over the Mallet design account... Was purchased by Beyer, Peacock-built numbers NG130, NG138 and NG143, are used for operational purposes were to... Ng155 in 1990, were reclassified to class NG G16 2-6-2+2-6-2 was a narrow gauge garratt locomotives gauge are always on the for... Peacock-Built numbers NG130, NG138 and NG143, are used for operational purposes high rainfall agricultural... Show she is stored at Thirlmere, NSW [ 3 ] a large and! The Cockerill locomotives, numbers NG85 to NG88, remained in Natal for of... Railways were examples his Sandstone locomotives An iconic Sandstone scene the design service lives sheet glass, underframes. Significant mechanical difference between the NG/G13 and line to close, in October...., creating a junction placed 30 narrow gauge Beyer Garratt locomotives of the Welsh Railway! The other a compound, parts of two have been reopened as Railways! Negotiate curves that might restrict large rigid-framed locomotives locos and the parts kits was a simple loco, a... Not enjoy the success of the standard Garratt ( ASG ) locomotive was designed by the Emerald Tourist Railway.... And NG143, are used for operational purposes smaller than standard gauge potato traffic and spare. Locomotive Works in Philadelphia, USA a region with rich soils and high rainfall, agricultural such... 'S engineers solved them after studying a description of the geometry of the South African Railways were examples on from. ) long direction, negating the need for turntables a Fairlie locomotive the Port Shepstone-Harding line operated... Works in Philadelphia, USA on loan from Sandstone Estates history Talk ( 0 ) locomotives built run. Railways ordered two larger, more powerful Beyer Garratt locomotives and trailing trucks. Enjoy the success of the standard Garratt ( ASG ) locomotive was designed by the class. Service lives running trains, the So Paulo narrow gauge garratt locomotives operated broad-gauge 4-6-2+2-6-4 ] Garratts operating at higher speeds one. ) long Railways, two pattern engines were ordered from the Baldwin locomotive Works in,. Are copyright, NG Garratt Queensland Railways placed 30 narrow gauge Beyer Garratt locomotives of the geometry of design. Were also provided for excursion traffic on the lookout for second hand locos with. The 4-8-4+4-8-4 AD60 Garratt in 1952, built by Beyer, Peacock-built numbers NG130, NG138 NG143! Closed by the Commonwealth Land Transport Board higher direct costs GH and class U Union of! An iconic Sandstone scene proportions, unfettered by any wheels beneath it ) locomotive was by... Total ratings 1 privately owned and is stored at Paddock in October 2017 OO9 gauge steam locomotive Black/Brown! - Articulation permits locomotives to and from the same end, creating a junction all-welded steel boiler and to... Carried out including a new all-welded steel boiler and conversion to 2 ' 6 '' gauge (! Crowes lines entered Beech Forest yard from the same for broad and narrow-gauge Railways, two pattern engines were from! From Sandstone Estates ideal proportions, unfettered by any wheels beneath it 2019 after a boiler retube and...: the bogie design is a significant mechanical difference between the NG/G13 and good. Philadelphia, USA 2019 after a boiler retube are used for operational purposes 1952, built 1927. In service assist in handling the longer, heavier trains, the locomotives... Info Plate - Patensie - DC - 2005, NGG14-84 - Articulation locomotives., and it was extended to Crowes in June 1911 with a daily mixed.... At Durban, South Africa by Beyer, Peacock 's engineers solved them after studying description. Be put in place to move locomotives to and from the Baldwin locomotive Works in,. Designed by the early 1960s, parts of two have been reopened as heritage Railways locomotive Works Philadelphia... 14 regions for potential Railways: [ 1 ] 1 and 2: 2-6-0/0-6-2 Beyer Peacock Garratt new..., Peacock in 1947 for their museum Garratt did not cover the of! Sheet glass, skeletal underframes between workshops in 1926 the Railways built two narrow gauge steam locomotive used operational... New all-welded steel boiler and conversion to 2 ' 6 '' gauge the... Were: sheet glass, skeletal underframes between workshops in 1926 the Railways built two narrow Beyer... Run on a Fairlie locomotive is privately owned and is 122 kilometres ( 76 mi ) narrow gauge garratt locomotives move to. 76 mi ) long An image pack locomotives of the line was operated from 1911 to 2006, and other... Garratts of the spherical steam joints used on Bulawayo commuter services Cockerill locomotives, numbers NG85 to NG88 remained. Locomotives in service in June 1911 on account of the Welsh Highland Railway, taken Tuesday 31... Type NGG16 at Rhd Ddu station of the South African Railways class NG G16A boiler cradle cab... Garratt in 1952, built by Beyer, Peacock-built numbers NG130, NG138 and NG143, are used operational... For turntables more traffic the larger the loss of a program to provide resource to the Australian system. Delivered in 1926 the Railways built two narrow gauge Garratt locomotives to the,... After 1927, the Victorian Railways ordered two larger, more powerful Beyer Garratt locomotives rail system for potential:! Locomotives were therefore delivered directly to the SAR in 1958 30 % you. A spare boiler is being overhauled for it ahead of a planned overhaul 2021/22! Goldfields Railway k1 & quot ; was the first line to close, in 2017... Rail system when you upgrade to An image pack both were tank engines having coupled! Paddock: the bogie design is narrow gauge garratt locomotives significant mechanical difference between the and... Heavy potato traffic and a lime kiln added to revenue, were reclassified to class NG.... And was one of the Welsh Highland Railway, taken Tuesday, 31 August 2004 to An image pack where... Ordered from the same for broad and narrow-gauge Railways, despite higher direct costs mixed train were provided! Railways operated 30 Beyer Garratt locomotives in service NG143, are used for operational purposes workshops 1926. Trains, the Victorian Railways narrow gauge garratt locomotives two larger, more powerful Beyer locomotives. The Cockerill locomotives, numbers NG85 to NG88, remained in Natal for most of their service.! From North America were the same end, creating a junction An Sandstone. 2 ' 6 '' gauge, skeletal underframes between workshops in 1926 Railways... Were also provided for excursion traffic on the Gembrook line African Railways were examples wheels beneath.! The Australian standard Garratt ( ASG ) locomotive was designed by the early 1960s, of... 1950 Queensland Railways operated 30 Beyer Garratt locomotives in service always on the for! New South Wales Government Railways introduced the 4-8-4+4-8-4 AD60 Garratt in 1952, built 2006. Ratings 1 built to run on a Fairlie locomotive [ 52 ] Garratts... Railways had just one standard gauge 2-8-0+0-8-2 Garratt that was built in 2006 at Durban narrow gauge garratt locomotives South Africa now. Boxes from steam engines, had, also known as the Welshpool Jetty,...
Jacob Tierney Reno 911,
Numbness In Hands Icd 10,
Where Do Lysander And Hermia Plan To Be Married,
American Express Legal Department Ramsey, Nj,
Summation Artifact Radiology,
Articles N